Lol. A buddy comes up for three days by me for two barns. 24 at the one. . .2 half sets, 1 trim, 21 full sets. Get them done in two days, usually done about 3 on the second day. Sent from my DROID RAZR using Tapatalk 2
the cheapest trim would be 20 euros dearest trim 40 euros cheapest set 45 euros dearest 100 euros for a plain set
... About 1 hour half shod hot all four loading not in no big hurry if its got extras a little longer I'm happy with 600 a day if working by myself with help a little more...I go off a profit margin rather how many can be done .. if its half shoes or trims we do how many it takes to hit that margin...some days we make a little more or little less ...I have help 3 days a week and he works on his own two days and I work on my own those two also..
That would be $28-56 on a trim and $63-142 on a set. Round me it's probably $25-55 on a trim and $65-200 on a set Sent from my DROID RAZR using Tapatalk 2
Not much different than here in how wide of price gaps...I would have never guessed that ... Here I see why price has wide gap ..due to training and how well of a job each does ..cost of living..among other factors.. I was under the impression where smitty is all the training was highly regulated and all had the same training and had a lengthy apprenticeship and that would keep prices pretty close to the same ...
14 sets in 9 hours. 9 hours is 540 min so that makes a set every 38 1/2 min and there's no time for travelling, lunch, pee, anything included in that.
In your opinion smitty. . .what was the work like and how'd the feet look when he came back? Sent from my DROID RAZR using Tapatalk 2
Todd Walker told me when he worked fort Kirk caudle that Kirk would reset one in 17 min (i believe) with Todd running the fire. Sent from my DROID RAZR using Tapatalk 2
Texted Todd. Says it was 8 min that he could do and there were two witnesses to it. Sent from my DROID RAZR using Tapatalk 2
Josh he very fit, very skilled,very clever did not have much time for chit chat some things he always made sure the horses were in and ready he always started his 1st horseat 8 and was always back in the forge at 5 spent 1 hour getting ready for the next day and never broke the system